Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a bespoke ventilation and climate control system built to comply with demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) https://scrapbookmarket.com/story20646408/penmann-ltd-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2