Test that the facility twine is plugged in many of the way. Pull out the refrigerator if required and press the plug firmly to the outlet.[1] X Analysis supply Reconnect Wiring. Reattach the wires and connectors to the corresponding terminals on the new inverter board. This Web site is https://douglasw999maq6.tusblogos.com/profile