The answer In such cases is always to push The existing-injection electrodes as deep as you possibly can and wet the soil all-around these electrodes with saltwater2. This should be completed just for the larger sized electrode spacings. We operate with several pile forms, which include bored piles, pushed piles, https://zandercnxjt.idblogz.com/36671822/the-5-second-trick-for-soil-conductivity-testing-bd