For those who’re setting up sod with a slope, begin laying the sod at the lowest stage. Stake each piece in three locations to stop slippage. Stakes needs to be equally spaced and set in through the sod strip’s edges by at the least six to 8 inches. Killing the https://emperori318eox7.p2blogs.com/profile